Piping Engineering Design
Zero Level / Proposal Level MTO


DWG offers an zero level MTO for estimation and proposal
approval level MTO by routing temporary line between two
equipments.
So this helps to calculate approximate estimation of the
project.
There are three stages of material take-off (MTO) in a process piping project.
- Preliminary,
- Secondary, and
- Final.